Logged a “sinking” deck barge at 0600 UTC, built a full risk profile — AIS track verified, 1.8 m tide range checked, pump capacity estimated — and even set a preliminary reserve, then the drone shows her snug to the fuel dock with about 6 inches of freeboard and a very chipper bilge pump. What’s your best painstaking assessment that ended with a vessel aggressively afloat?